Case studies · Featured

Specialist GRE fire water systems for ISND 5.1

PEC was the GRE specialist on ISND 5.1, working with main contractor COOEC and offshore contractor Qatar Shipyard for end user QatarEnergy.

Non-metallicFabricationOffshore
End user
QatarEnergy
Main contractor
COOEC
Offshore contractor
Qatar Shipyard
PEC role
GRE specialist
System
GRE fire water & sprinkler lines
Pipe sizes
DN25 to DN150

The scope

Specialist GRE fire water and sprinkler lines, from DN25 to DN150, for the ISND 5.1 offshore development.

How PEC delivered

  • Spool fabrication and assembly: specialist GRE spools fabricated and assembled.
  • Adhesive bonding and jointing: precision adhesive bonding and jointing.
  • Hydrostatic pressure testing: lines pressure-tested hydrostatically.
  • Overlap lamination: fire-resistant overlap lamination.

Project record

On the PEC project record.

Read more about the project on the reference projects page.