Case studies · Featured
Specialist GRE fire water systems for ISND 5.1
PEC was the GRE specialist on ISND 5.1, working with main contractor COOEC and offshore contractor Qatar Shipyard for end user QatarEnergy.
- End user
- QatarEnergy
- Main contractor
- COOEC
- Offshore contractor
- Qatar Shipyard
- PEC role
- GRE specialist
- System
- GRE fire water & sprinkler lines
- Pipe sizes
- DN25 to DN150
The scope
Specialist GRE fire water and sprinkler lines, from DN25 to DN150, for the ISND 5.1 offshore development.
How PEC delivered
- Spool fabrication and assembly: specialist GRE spools fabricated and assembled.
- Adhesive bonding and jointing: precision adhesive bonding and jointing.
- Hydrostatic pressure testing: lines pressure-tested hydrostatically.
- Overlap lamination: fire-resistant overlap lamination.
Project record
On the PEC project record.
Read more about the project on the reference projects page.

Your project
Have a scope in mind?
Tell us about the asset, the location and the window you have. Our team will come back with a technical proposal and a mobilisation plan.