Case studies · Dec 2021

GRE pin-hole leak rectification on Argus T-5051, Halul Terminal

A pin-hole leak on a GRE line at QatarEnergy's Halul Terminal arrested to an approved 3X Engineering proposal, under PEC's GRE and GRP call-off contract.

Non-metallicComposite repairOffshore terminal
Client
QatarEnergy, Halul Terminal
Contract
MC20104700, GRE & GRP call-off
Location
Halul Island, Qatar
Completed
22 December 2021
Repair validity
Up to December 2026
Partner
3X Engineering

The scope

Rectification to arrest a pin-hole leak on Argus T-5051, under PEC's call-off contract for the repair and replacement of GRE and GRP lines and associated fittings at Halul.

How PEC delivered

  • Carried out by PEC's GRE Non-Metallic Division to a technical proposal approved from 3X Engineering.
  • Executed with a certified 3X Engineering technician.
  • Completed on 22 December 2021, with the repair valid up to December 2026; confirmed on inspection in June 2024.

Signed off

The client's sign-off.

Open a document to view it in full.

Your project

Have a scope in mind?

Tell us about the asset, the location and the window you have. Our team will come back with a technical proposal and a mobilisation plan.