
Case studies · Sep 2022
Special composite wrap on the KK1 subsea pipeline, Al Karkara Field
A subsea composite repair for internal corrosion on the KK1 pipeline for Qatar Petroleum Development Japan, installed with 3X Engineering.
- Client
- Qatar Petroleum Development Co., Japan (QPD-J)
- Contract
- SRC-2220026
- Location
- Al Karkara Field, offshore Qatar
- Completed
- 25 September 2022
- Repair
- Subsea, internal corrosion
- Partner
- 3X Engineering
The scope
Installation of a special composite wrap to cover the KK1 pipeline, as a subsea repair for internal corrosion.
How PEC delivered
- Executed by PEC's Composite Wrapping Division with a certified 3X Engineering technician.
- Installed under the direct supervision of a 3X Engineering engineer.
- Completed on 25 September 2022; the completion report was acknowledged by QPD-J in October 2022.
Signed off
The client's sign-off.
Open a document to view it in full.

Your project
Have a scope in mind?
Tell us about the asset, the location and the window you have. Our team will come back with a technical proposal and a mobilisation plan.
